Welcome, Guest. Please login or register.

Login with username, password and session length

 
Advanced search

10 904 Posts in 6 279 Topics- by 1 216 Members - Latest Member: santini862

14 August 2020, 08:00
Select Language English | Russian ru | German
Main PageIRC Client KVIrc forumGeneralAnnouncementsbarite milling production line
Pages: [1]
Print
Author Topic: barite milling production line  (Read 87 times)
0 Members and 1 Guest are viewing this topic.
gjsohcat
Постоялец
***

Репутация: 0
Posts: 209


View Profile Email
« on: 17 July 2020, 06:06 »

After the work of the barite milling production line is completed, the barite grinding mill equipment should be regularly cleaned and maintained, so that the production line equipment should be kept in an optimal state of use.

1. Start the bucket elevator;
2. Start the jaw crusher;
3. Start the analyzer after the material is stored in the silo;
4. Start the blower (empty load start, then load after normal operation); The host computer starts the electromagnetic vibrating feeder immediately after starting the host.

At this point the grinding work is the beginning. The simple sequence of operation sequence is as follows: start: hoist → crusher → analyzer → fan → host → feeder.
Logged
Pages: [1]
Print
Jump to:  

Theme orange-lt created by panic